| |
References |
| |
- 20 TONS LIFTING CAPACITIED, DOUBLE SPEEDED and 19.3 m SPAN PORTAL
CRANE:
All calculations are done and design and manufacturing projects
are prepared.
[ Divriği Pellet Plant - Kutlutaş ]
- SLIDE GATE 900x900 HAND AND ELECTRICAL DRIVEN
Projecting, calculating, manufacturing, trying.
- REFULATING VALVE (radius 900) hand and electrical driven.
- TRASHRACKS, BULKHEAD GATES AND PENSTOCK.
Projecting, calculating, manufacturing of trashrack and Bulkhead
Gates.
[ Güldürcek Dam/DSİ - Suta ]
- BULK CEMENT TRANSPORT TANK.
Pnomatic filing up, pouring out systems.
- DRINKING AND IRRIGATINGWATER DISTRIBUTING NETWORK
Calculations, design and detailed manufacturing project.
[ DSİ - Gaziantep ]
- SLIDING MOULD PROJECT
Calculations, design and detailed manufacturing project.
[ Urfa Tunnel ]
- HANDLING SYSTEM OF MATERIAL DETERGENT CONVEYORS, ELEVATORS,
SCREW CONVEYORS PNOMATICLY OPERATED BUTTERFLY GATES ELECTRONIC
BATCHING WEIGHER.
[Turyag - İzmir ]
- CARBON BLACK STORAGE, FEEDING DAILY TANKS, PREPARATION of C/9
for BUNBURY MIXERS,
Complete design and detailed manufacturing projects, manufacturing
erectioning and taking into operation.
Contract includes also eletronic control system and electronic
batching weighers.
<back - next>
|
|
|
|
 |