| |
References |
| |
- HAZEL - NUT ENTEGRE PLANT TECHNOLOGICAL EQUIPMENT DETAILED MANUFACTURING
PROJECTS.
- BARRAGE PERMANENT EQUIPMENTS:
- BUTTERFLY VALVES
- GATE VALVES
- EXPENTION JOINTS
- PENSTOCK, MENHOLLS AND SUPPORT
Preparation of necessary calculation, complete and detailed
manufacturing projects, manufacturing, supervising of water-tight
conditions in trial stands of hydraulic pressure controls
and their erections with delivery.
Barrage of Yapılatın-DSİ / KISKA
Barrage of Maksutlu-DSİ / KISKA
- PRESTRESSED CONCRETE TUBE FACTORY MACHINARY
Radius 3 m and length of 6m
- CONCRETE PLANT (1) (Concrete Preparing Plant )
30 m³/h capacity, automatically weighing machine type.
- CONCRETE PLANT (2)
50 m³/h capacity, automatically weighing machine typed concrete
preparation plant detailed manufacturing projects are prepared.
next>
|
|
|
|
 |